Cycle Gear and Phenix Salon

Here our crew began with performing the “LL” or landlord scope which consisted of removal and upgrades to the RTU’s and bathroom exhaust fans. After completion we progressed into the TI improvements for the tenants of Cycle Gear. The TI improvements included; design, build and install of all ductwork, air curtains and indoor equipment. Project…

Read more

85 Bakery

Here the crews helped hang hoods, run grease duct, assemble walk in coolers and set RTU’s. A smaller job but another great opportunity for AMS to build and create promising relationships for the future. Project Type New Construction/Tenant Improvements Budget $95,000 Completion Date: Spring 2021

Read more

Tiger Project Renton

Here AMS took part in the design, preparation and installation of a Amazon packaging/distribution center. From start to finish we worked alongside other trades safely to ensure everybody was able to see this job through healthy. With over 16 fans and multiple rooftop units our team was able to showcase their craftsmanship. Project Type New…

Read more

HSBC Bellevue

HSBC is a renovation and improvement to the existing system that required the AMS team to install/collaborate with HSBC to ensure their needs were met. Project Type New Construction/Tenant Improvements Budget $70,000 Completion Date: Fall 2020- Present

Read more

Lakeshore Learning Center

Lakeshore Learning is a demolition and remodel of an existing space in the Factoria Mall in Bellevue, WA. Here the AMS team ordered and hung spiral duct for an exposed system, while helping resolve problems for the tenant. Project Type New Construction/Tenant Improvements Budget $50,000 Completion Date: Fall 2020- Present

Read more

Fieldstone- Puyallup

A 60 unit, new construction assisted living project that involved the installation of PTAC, DOAS, horizontal furnaces, outdoor units and kitchen hoods. Similar to the Olympia project, AMS spent several months retrofitting, planning and installing all necessary equipment for Fieldstone.

Read more

Connection Concourse- Auburn Mall

At the Auburn Mall, AMS demoed existing material used for a Planet Fitness. After demo we installed over 500 feet of spiral duct ranging in size from 36-12″. In addition existing rooftop fans and units were replaced with new ones along with internal equipment such as sensors and smoke- detectors. 

Read more

Planet Fitness- Woodinville

Here AMS demoed existing systems and then installed new a system. The new install included concentric units, rooftop units, diffusers, remote smoke detectors, low-voltage and air-balancing.

Read more

Quail Park- Assisted Living Project

Assisted living project that included an addition to a existing building, new construction on 16 cottages and extension of existing dining room/kitchen. Systems in this building included but were not limited to; VRV, rooftop Daikan units, Mitsubishi air-handlers, outdoor heat-pumps, and remote controlled sensors. Project Type New Construction/Tenant Improvements Budget $ 2 million Completion Date:…

Read more

At Home – Puyallup

This is a brand new AT HOME location where we installed new HVAC, duct work, rooftop units, DOAS units, unit heaters, and control wiring.

Read more