Swiftwater Condos

Design build- Here AMS worked with the GC and owners to design and install a beautiful forced air and ductless split system. 24 Condos in the heart of Suncadia. Project Type Design Build- New Construction Project Timeline: Spring 2022- Current.

Read more

Tiger Project Renton

Here AMS took part in the design, preparation and installation of a Amazon packaging/distribution center. From start to finish we worked alongside other trades safely to ensure everybody was able to see this job through healthy. With over 16 fans and multiple rooftop units our team was able to showcase their craftsmanship. Project Type New…

Read more

Connection Concourse- Auburn Mall

At the Auburn Mall, AMS demoed existing material used for a Planet Fitness. After demo we installed over 500 feet of spiral duct ranging in size from 36-12″. In addition existing rooftop fans and units were replaced with new ones along with internal equipment such as sensors and smoke- detectors. 