Here AMS took part in the design, preparation and installation of a Amazon packaging/distribution center. From start to finish we worked alongside other trades safely to ensure everybody was able to see this job through healthy. With over 16 fans and multiple rooftop units our team was able to showcase their craftsmanship.
Project Type
New Construction
Completion Date:
Fall 2020 – March 2021